Transportation, pedestrian impacts: West Campus Drive sidewalk repairs

From: Division of Facilities
To accommodate a tunnel top replacement, a portion of the sidewalk and bike lane on West Campus Drive, in front of Fralin Hall, will be temporarily unavailable from approximately Tuesday, May 27 - Sunday, June 22.
During this time, an alternative mulched route is available around the construction area.
The south facing pathway through Fralin Hall will be temporarily unavailable from approximately Sunday, June 15 - Friday, Aug. 8.
During this time, alternative routes are available along West Campus Drive and through the connection of Fralin and Engel Halls.
Directional signage will be posted to assist with navigation. Pedestrians may also use the Interactive Campus Map to assist with navigation.
Questions may be directed to vtrepair@vt.edu.

