Virginia Tech® home

Pedestrian impacts: Norris Hall exterior repairs

From: Division of Facilities 

To accommodate exterior repairs, construction fencing will surround Norris Hall adjusting pedestrian routes around the building from approximately Monday, Aug. 12 - Saturday, March 15. 

During this time, an ADA pathway will be available from the sidewalk facing Old Turner St., in between Norris Hall and Burruss Hall, and in between Norris Hal and Patton Hall. 

Additionally, the Norris Hall tunnel will remain open.

Signage will be posted to assist with navigation. 

Pedestrians may utilize the Campus Closures Map to assist with navigation.

Questions may be directed to vtrepair@vt.edu

ADA routes at Norris Hall from Aug. 12 - March 15.
Share this page