To accommodate the development of an Americans with Disabilities Act (ADA)-compliant pathway spanning from the Transit Center to the Drillfield, a portion of the outdoor space between Pamplin and Burruss halls will be closed beginning Monday, July 15, through mid fall 2024 to ensure pedestrian safety.

As impacts to accessible and pedestrian routes evolve through the pathway's development, updates will be shared.

Pedestrian and accessible route impacts: July 17-24

From approximately Wednesday, July 17 - Wednesday July 24, accessible routes will be available:

  • Along the north side of Derring Hall (Hitt Hall side) and via elevators through Cowgill and Derring Halls
  • Through the Pamplin Hall parking lot, through Pamplin Hall via elevators, through the east side of Pamplin Hall (Burruss Hall side), along the pathway to the north of Williams Hall (Pamplin Hall side) and toward the Drillfield
  • Through Burchard Plaza, along the east side of Burruss Hall (Norris Hall side), along the pathway to the north of Patton hall (Norris Hall side), through Patton Hall via elevators to the Drillfield

Additional pedestrian routes will be available along the west side of Burruss Hall (Pamplin Hall side) and between Robeson and Pamplin Halls.

During work, available accessible pathways are marked in blue from July 17-24.

Pedestrian and accessible route impacts: July 24-Aug. 7

From Wednesday, July 24 - Wednesday, Aug. 7, the accessible pathway parallel to the west side of Burruss Hall and the east side of Johnston Student Center will be open. 

The pathway between Burruss Hall and Johnston Student Center is open and marked by a blue line indicating an accessible route
During work, available accessible pathways are marked in blue from July 24 - August 7.

Pedestrian and accessible route impacts: Aug. 7-14

From Wednesday, Aug. 7 - Wednesday, Aug. 14, the accessible pathway parallel to the west side of Burruss Hall and the east side of Johnston Student Center will be temporarily closed between the two buildings. 

Additional pedestrian routes will be available along the east side of Burruss Hall (Norris Hall side) and between Robeson and Pamplin halls.

The pathway between Burruss Hall and Johnston Student Center is closed and marked by a yellow box. Accessible routes in blue go around the east side of Burruss Hall.
During work, available accessible pathways are marked in blue from August 7-14.

Pedestrian and accessible route impacts: Aug. 14-30

From Wednesday, Aug. 14 - Friday, Aug. 30, the accessible pathway parallel to the west side of Burruss Hall and the east side of Johnston Student Center will be temporarily closed between the two buildings. 

An accessible interior route from Pamplin Hall, through Johnston Student Center, and in to Burruss Hall will be available. 

Additional pedestrian routes will be available along the east side of Burruss Hall (Norris Hall side) and between Robeson and Pamplin halls.

A map of the North Academic District showing an accessible interior route from Pamplin Hall, through Johnston Student Center, and in to Burruss Hall.
An accessible interior route from Pamplin Hall, through Johnston Student Center, and in to Burruss Hall will be available starting Aug. 14

Directional signage will be posted to assist with navigation.

Pedestrians may also utilize the Interactive Campus Map to assist with navigation.

Questions may be directed to vtfacilities@vt.edu.