Virginia Tech® home

Mechanical utilities repairs beginning on May 18

From: Division of Facilities 

Beginning on May 18 and lasting until approximately July 31, there will be several repairs to mechanical utilities across the Blacksburg campus. These repairs will result in the removal of the steam tunnel tops and close a portion of the sidewalk in the following locations:

  • Eggleston Hall-Kent Street
  • Torgerson Hall-Stanger Street
  • McBryde Hall-Stanger Street

Pedestrians may utilize the Campus Closures Map to assist with navigation.

Questions may be directed to vtrepair@vt.edu.

 

Several repairs to mechanical utilities across the Blacksburg campus will result in the removal of the steam tunnel tops and close a portion of the sidewalk shown in the image.
Several repairs to mechanical utilities across the Blacksburg campus will result in the removal of the steam tunnel tops and close a portion of the sidewalk shown in the image.
Several repairs to mechanical utilities across the Blacksburg campus will result in the removal of the steam tunnel tops and close a portion of the sidewalk shown in the image.
Share this page